Shedding light on a tile problem

A long-time friend called today to ask for our insight on her tile installed by someone her contractor hired (not us). She was happy when the installer finished and got the edge trim corrected, but when her under-cabinet lights were mounted new problems appeared.

The growing use of accent lighting and handmade tiles exacerbates an issue that needs to be addressed before the first tile is installed. Die release lines on ceramic mosaics, scored tiles, and uneven edges on tile will cast distinctive shadows when highlighted by direct overhead lighting –-even if the tile is installed meeting acceptable standards. In this case, the tile installation had some issues that made the situation worse, so her contractor is having everything taken out and re-done.

elli splash

Under cabinet lights require prior planning by all involved.

This time, he needs to 1) make sure the surface to be tiled is totally smooth and flat or specify a mortar bed installation; 2) discuss the tile selection with the homeowner and explain the potential issues that the tile chosen could produce; 3) make sure the finished lighting is in place and functioning prior to the tile installation so any shadows can be immediately addressed; 4) and discuss a pattern change or widening the grout joints to allow for more gradual variation as shadows are cast over the tile.

The tile installer will, of course, need to perform his craft carefully, properly adhere and  ‘beat-in’ the tile, and perhaps present a mock-up to get prior approval. Like so many issues in construction, this one could have been prevented by:

  1. using professionals in the selection process who are knowledgeable about potential “gotcha’s”;
  2. using high-quality materials produced by known manufacturers (not necessarily high-priced);
  3. using experienced and qualified installers who can help identify issues before they become problems.

We know our friend will love her new kitchen after the removal and replacement is completed, but her 72-day renovation has now been prolonged another week. When she gets ready to do the bathroom, she says she’ll call us first 🙂

#NotAsEasyAsItLooksOnTV


Leave a comment

Championship team for locker room tile

It takes a team — to win a national championship, to complete a successful construction project, and to get your tile installed correctly.

We are honored to be featured on the cover of our industry’s unc-pools-compTileLetter publication for our work at the UNC Basketball Locker Room. [TileLetter 2017 at Dean Smith Center.]

It was a great project for the Neuse Tile team, of course, but, as good as they are, it takes more than just our skilled craftsmen to make it happen. Our behind-the-scenes team members monitor every detail of estimating, ordering, warehousing, scheduling, supervising, and accounting. And, with a project like this one that’s happening at a rapid pace, with strict parameters, and involving a variety of types of installation, there are also representatives from mortar manufacturers, tile suppliers, and industry specifiers ready to help. (The accumulation of years of industry experience and lots of shared industry knowledge help, too 🙂

We appreciate the hard work of all members of the tile team, as well as the UNC facility staff, the Architects at Corley Redfoot, and the design professionals in the comp JimSink22 overview with partitionsKansas City office of HOK. And a particular thank you to General Contractor, Vision Contractors Inc. for including us in this truly championship locker room!


2 Comments

Slam-dunk tile in UNC locker room

Take a break from Thanksgiving family dynamics and enjoy these photos of our recent tile installations in the UNC men’s basketball locker room at the Dean E. Smith Center in Chapel Hill. Mud bed floors flowing to 12 different drains, large-format glass in an expansive area, polished stone, 2×2 mosaics, large-format porcelain in multiple sizes, and honed decorative stone made this one a technical treat. Thanks to Vision Contractors and the facility managers and coaches for adding us to the team for this special, world-class project!